Difference between revisions of "PITMinutes 12-05-2016"
(8 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
== Attendance == | == Attendance == | ||
− | R. Bachimanchi, K. Baggett, | + | R. Bachimanchi, K. Baggett, A. Freyberger, R. Geng, C. Hovater, G. Krafft, R. Legg, C. Mounts, T. Plawski, C. Reece, and S. Suhring |
== Agenda and Notes == | == Agenda and Notes == | ||
+ | |||
+ | 0. Final Meeting of the Year: Merry Christmas and | ||
+ | Happy New Year! Lunch (drinks on Freyberger) Plaza Azteca | ||
+ | on the 19th! | ||
1. Operations Status and Summary | 1. Operations Status and Summary | ||
+ | High efficiency physics running started. | ||
+ | News on RF separator. | ||
+ | |||
+ | Separator beginning of year. | ||
+ | |||
+ | Instabilities in 2L23. Cavities lowered to make | ||
+ | stable. Lost 2 MV cavity. | ||
2. Fast X-ray Detection (Geng) | 2. Fast X-ray Detection (Geng) | ||
[https://casa.jlab.org/LINACPIT/Fast_X-ray_detection_for_FE_in_CEBAF_cavities_14nov16.pptx X-ray Measurements and Field Emission] | [https://casa.jlab.org/LINACPIT/Fast_X-ray_detection_for_FE_in_CEBAF_cavities_14nov16.pptx X-ray Measurements and Field Emission] | ||
− | |||
3. C100 Investigation (Ken Baggett) | 3. C100 Investigation (Ken Baggett) | ||
Line 28: | Line 38: | ||
− | + | 5. Regular reporting; Josh, Tom, and Thomas in two weeks. | |
[https://casa.jlab.org/LINACPIT/Girder_Particulate_Summary2016-08-15b.pptx Girder Particulate Summary] | [https://casa.jlab.org/LINACPIT/Girder_Particulate_Summary2016-08-15b.pptx Girder Particulate Summary] | ||
== Action Items == | == Action Items == |
Latest revision as of 15:44, 5 December 2016
Attendance
R. Bachimanchi, K. Baggett, A. Freyberger, R. Geng, C. Hovater, G. Krafft, R. Legg, C. Mounts, T. Plawski, C. Reece, and S. Suhring
Agenda and Notes
0. Final Meeting of the Year: Merry Christmas and Happy New Year! Lunch (drinks on Freyberger) Plaza Azteca on the 19th!
1. Operations Status and Summary
High efficiency physics running started.
News on RF separator.
Separator beginning of year.
Instabilities in 2L23. Cavities lowered to make stable. Lost 2 MV cavity.
2. Fast X-ray Detection (Geng)
X-ray Measurements and Field Emission
3. C100 Investigation (Ken Baggett)
Arne's Energy Reach Summary Document
Gradient Team Extended Charter
4. Microphonic Studies
Discussion whether to have regular project and agenda item on this subject
5. Regular reporting; Josh, Tom, and Thomas in two weeks.