Difference between revisions of "PITMinutes 11-21-2016"
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
== Attendance == | == Attendance == | ||
− | R. Bachimanchi, K. Baggett, M. Drury | + | R. Bachimanchi, K. Baggett, K. Davis, M. Drury, C. Hovater, G. Krafft, R. Legg, C. Mounts, T. Plawski, T. Powers, R. Rimmer, C. Reece |
== Agenda and Notes == | == Agenda and Notes == | ||
Line 7: | Line 7: | ||
1. Operations Status and Summary | 1. Operations Status and Summary | ||
− | + | Separation Commissioning was successfully | |
+ | completed. Optics improvement verified. | ||
+ | |||
+ | Separator Problems: Vacuum Leak in 750 MHz systems. | ||
+ | Activated! | ||
+ | |||
+ | Beam Strike? Further investigation. | ||
+ | |||
+ | Reinstall shortly before or after holiday down. | ||
+ | |||
+ | BPM problems in separator regions? | ||
− | |||
2. Piezo Tuner Studies (T. Pawski) | 2. Piezo Tuner Studies (T. Pawski) |
Latest revision as of 10:19, 5 December 2016
Attendance
R. Bachimanchi, K. Baggett, K. Davis, M. Drury, C. Hovater, G. Krafft, R. Legg, C. Mounts, T. Plawski, T. Powers, R. Rimmer, C. Reece
Agenda and Notes
1. Operations Status and Summary
Separation Commissioning was successfully completed. Optics improvement verified.
Separator Problems: Vacuum Leak in 750 MHz systems. Activated!
Beam Strike? Further investigation.
Reinstall shortly before or after holiday down.
BPM problems in separator regions?
2. Piezo Tuner Studies (T. Pawski)
3. C100 Investigation (Ken Baggett)
Arne's Energy Reach Summary Document
Gradient Team Extended Charter
4. Microphonic Studies (Tom Powers)
Discussion whether to have regular project and agenda item on this subject.
5. Fast X-ray Detection (Geng)
6. Regular reporting; Josh, Tom, and Thomas in two weeks.