(New page: == Attendance == R. Bachimanchi, K. Baggett, K. Davis, M. Drury, C. Hovater, G. Krafft, R. Legg, C. Mounts, T. Plawski, T. Powers, R. Rimmer, C. Reece == Agenda and Notes == 1. Operatio...)
 
Line 7: Line 7:
 
1. Operations Status and Summary
 
1. Operations Status and Summary
  
Separation Commissioning was successfully
+
 
completed. Optics improvement verified.
+
Separator Problems: Vacuum Leak in 750 MHz systems.
+
Activated! Beam Strike? Further investigation.
+
Reinstall shortly before or after holiday down.
+
BPM problems in separator regions?
+
  
  

Revision as of 10:18, 5 December 2016

Attendance

R. Bachimanchi, K. Baggett, K. Davis, M. Drury, C. Hovater, G. Krafft, R. Legg, C. Mounts, T. Plawski, T. Powers, R. Rimmer, C. Reece

Agenda and Notes

1. Operations Status and Summary



2. Piezo Tuner Studies (T. Pawski)

Piezo Status Report

3. C100 Investigation (Ken Baggett)

C100 Energy Reach Request

Arne's Energy Reach Summary Document

Gradient Team Extended Charter

4. Microphonic Studies (Tom Powers)

Tuner Measurements and Plan

Discussion whether to have regular project and agenda item on this subject.

5. Fast X-ray Detection (Geng)

6. Regular reporting; Josh, Tom, and Thomas in two weeks.

Girder Particulate Summary

Action Items