== Attendance ==
 
== Attendance ==
  
R. Bachimanchi, G. Ciovati, C. Hovater, G. Krafft, A. Kimber, R. Legg, C. Mounts, R. Nelson, T. Powers, T. Reilly, C. Reece, B. Rimmer
+
G. Krafft, A. Kimber, R. Legg, F. Marhauser, R. Geng, C. Reece, H. Zhang
  
 
== Agenda and Notes ==
 
== Agenda and Notes ==
Line 7: Line 7:
 
1. Operations Status and Summary
 
1. Operations Status and Summary
  
C50-12 installed. Testing tonight Commissioning and
+
Field emission and radiation measurements continue.
checkout ???.
+
  
microphonics??? Tuner dampers tested Thursday:
+
C100 He processing.
cavities 1 6 7 8 have been damped others still show
+
fluctuations. Tested again tonight.
+
 
+
Field Emission and Radiation Measurements.
+
accumulation downstream. Cavity-cavity and module to module.
+
 
+
Q vs. E on the NL12. Good idea to continue!
+
 
+
C100 He processing. NL23 improvments on field emitters.  6 FE
+
cavities processed. Continuing.
+
  
 
2. Gradient Team  (Bob Legg)
 
2. Gradient Team  (Bob Legg)
  
First Pass at closeout document
+
First Pass at closeout document.
Process to close out with stakeholders
+
Return to Pre-team
+
 
+
4. Field Emitters Movement (Geng/Zhang)
+
 
+
Indigo Site available
+
The indico web site for the followup meeting is
+
  
[https://casa.jlab.org/LINACPIT/LLRF_Firmware_Recs_Status_8_29_16.pptx LLRF FIrmware Recommendations]
+
Process to close out with stakeholders started
  
 +
Effort coordination returns to PIT (return to pre-team situation)
  
 +
[https://casa.jlab.org/LINACPIT/PIT_CloseOut_Talk.pptx Gradient Team Draft Closeout]
  
5. General Discussion on Future Directions (Krafft)
+
3. Field Emitters Movement (Geng/Zhang)
  
 +
Meeting with Spata, He Zhang, Krafft, Geng, Roblin,
 +
and Freyberger scheduled for initial go-through on
 +
Field Emitter movement, and modelling. First meeting
 +
after this one.
  
 +
4. General Discussion on Future Directions/Focus (Krafft)
  
6. Regular Reporting
+
5. Regular reporting; perhaps Josh in two weeks.
  
 
[https://casa.jlab.org/LINACPIT/Girder_Particulate_Summary2016-08-15b.pptx Girder Particulate Summary]
 
[https://casa.jlab.org/LINACPIT/Girder_Particulate_Summary2016-08-15b.pptx Girder Particulate Summary]
  
 
== Action Items ==
 
== Action Items ==

Latest revision as of 07:35, 28 September 2016

Attendance

G. Krafft, A. Kimber, R. Legg, F. Marhauser, R. Geng, C. Reece, H. Zhang

Agenda and Notes

1. Operations Status and Summary

Field emission and radiation measurements continue.

C100 He processing.

2. Gradient Team (Bob Legg)

First Pass at closeout document.

Process to close out with stakeholders started

Effort coordination returns to PIT (return to pre-team situation)

Gradient Team Draft Closeout

3. Field Emitters Movement (Geng/Zhang)

Meeting with Spata, He Zhang, Krafft, Geng, Roblin, and Freyberger scheduled for initial go-through on Field Emitter movement, and modelling. First meeting after this one.

4. General Discussion on Future Directions/Focus (Krafft)

5. Regular reporting; perhaps Josh in two weeks.

Girder Particulate Summary

Action Items