1. Operations Status and Summary
 
1. Operations Status and Summary
  
Microphonic damping feet on 0L04:
+
Microphonic damping feet on 0L04
correlation studies torque unused feet and microphonics.
+
 
 +
Correlation studies studies: systematically torque feet and measure microphonics.
 +
 
 +
Microphonic stabilization equipment installed on SL-24.
  
Stabilization equipmment on SL-24\:
 
 
Kirk Davis and Tom taking before and after data.
 
Kirk Davis and Tom taking before and after data.
Modify connections and check mode frequencies.
+
 
Minimize transfer into cavities.
+
Idea to modify connections and check mode frequencies.
Tuner damper to damp MP installed.
+
Minimize transfer of microphonics into cavities.
 +
Also installed tuner damper to damp MP .
  
 
Tuner damper rings in FEL04 also.
 
Tuner damper rings in FEL04 also.
  
Controls improvements to improve recovery times. Better diagnsotics
+
Controls improvements to improve recovery times implemented. Better diagnostics
 
Periodic trips being observed again. Snooping around for sources.
 
Periodic trips being observed again. Snooping around for sources.
  
 
RF Software improvement? capture trip. reduce interactions tuners and MP they generate.
 
RF Software improvement? capture trip. reduce interactions tuners and MP they generate.
  
might be benefity by raising press of SL 3-4 mbar.
+
There might be benefit by raising press of SL 3-4 mbar.
  
 
2. C50-12 Warm Girder Study Plan
 
2. C50-12 Warm Girder Study Plan
  
zBoth girders out,
+
Both girders out, module next few days.
  
Modules next few days.
+
Sampling plan for girders: about 20 different points.
  
Sampling plan for girders.
+
Samples will be also taken before/after gate valves replaced.
  
About 20 different points.
+
No visible dirt in beam pipe but dust has been observed.
  
Samples will be also taken as gate valvues replaced.
+
Warm valve problems and failures: due to Radiation?
  
No visibliy dirty in beam pipe but dust has been observed.
+
Added valve update and replacement to work.
 
+
valves problems.
+
 
+
warm val failures
+
Radiation problems?
+
Added valve update and replacement to allow work,
+
Warm regions will be pulled and looked at and processed
+
in SRF institute.
+
Studies of warm girders next to the removed 1L12 cryomodule.
+
Cryogenic planning for C50-12 discussed at 2:30.
+
May have to warm up NL10 and NL14 also.
+
Talk through cycling of internal valves from contamination
+
point of view.
+
 
+
Clean interior of both sides.
+
  
 
3. C75 on hold (Gigi Report)
 
3. C75 on hold (Gigi Report)
  
Complete Efforts for 2 prototypes. ARD
+
Complete Efforts for 2 prototypes. After report will chart
 +
a course forward.
  
2-3 weeks to complete mockup. 3.5 times 10 7
+
2-3 weeks to complete mockup. 3.5 times 10 7 for Q_L
  
several HOM loads located . Gradient and load and loaded Q
+
Several HOM loads located and low loss window located.
 
+
low loss window loacated.
+
  
 
Magnetic shielding and hygeine produced good result at cavity locations in CM.
 
Magnetic shielding and hygeine produced good result at cavity locations in CM.
  
C75 or C50 next year?
+
C75 or C50 next year? Waiting to decide/
  
 
4. Effects of desorbed gas on FE (Geng)
 
4. Effects of desorbed gas on FE (Geng)
Line 73: Line 60:
  
 
Covering of miniconflat by simple Al foil will not
 
Covering of miniconflat by simple Al foil will not
be good enough going forward. Paticle can still get around.
+
be good enough going forward. Particles can still get around.
  
 
Joint goal is to have final written procedure leading to low
 
Joint goal is to have final written procedure leading to low
particulate movements,
+
particulate movements.
 
+
NeG pump looking good.
+
 
+
 
+
  
[https://casa.jlab.org/html/LINACPIT/C100_Moduledsweb/Get/Document-117729/16-008.pdf Field Emission/ Talk]
+
NeG pump looking good. Will probably use in warm region.

Revision as of 09:09, 1 August 2016

Attendance

R. Bachimanchi, M. Drury, R. Geng, C. Hovater, A. Hutton, G. Krafft, A. Kimber, C. Mounts, R. Nelson, T. Plawski, T. Powers, C. Reece, T. Reilly, R. Rimmer

Agenda and Notes

1. Operations Status and Summary

Microphonic damping feet on 0L04

Correlation studies studies: systematically torque feet and measure microphonics.

Microphonic stabilization equipment installed on SL-24.

Kirk Davis and Tom taking before and after data.

Idea to modify connections and check mode frequencies. Minimize transfer of microphonics into cavities. Also installed tuner damper to damp MP .

Tuner damper rings in FEL04 also.

Controls improvements to improve recovery times implemented. Better diagnostics Periodic trips being observed again. Snooping around for sources.

RF Software improvement? capture trip. reduce interactions tuners and MP they generate.

There might be benefit by raising press of SL 3-4 mbar.

2. C50-12 Warm Girder Study Plan

Both girders out, module next few days.

Sampling plan for girders: about 20 different points.

Samples will be also taken before/after gate valves replaced.

No visible dirt in beam pipe but dust has been observed.

Warm valve problems and failures: due to Radiation?

Added valve update and replacement to work.

3. C75 on hold (Gigi Report)

Complete Efforts for 2 prototypes. After report will chart a course forward.

2-3 weeks to complete mockup. 3.5 times 10 7 for Q_L

Several HOM loads located and low loss window located.

Magnetic shielding and hygeine produced good result at cavity locations in CM.

C75 or C50 next year? Waiting to decide/

4. Effects of desorbed gas on FE (Geng)

Desorbed gas report coming.

Covering of miniconflat by simple Al foil will not be good enough going forward. Particles can still get around.

Joint goal is to have final written procedure leading to low particulate movements.

NeG pump looking good. Will probably use in warm region.