Difference between revisions of "PITMinutes 03-28-2016"
From CASA Wiki
(New page: == Attendance == R. Bachimanchi, S. Cooper, E. Daly, K. Davis, M. Drury, C. Hovater, R. Geng, G. Krafft, C. Mounts, C. Reece, T. Reilly, R. Rimmer, T. Plawski, T. Powers, H. Zhang == Age...) |
|||
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
== Attendance == | == Attendance == | ||
− | R. Bachimanchi, S. Cooper, E. Daly | + | R. Bachimanchi, S. Cooper, E. Daly, M. Drury, A. Freyberger, C. Hovater, R. Geng, G. Krafft, C. Mounts, C. Reece, R. Rimmer, T. Plawski, T. Powers, S. Suhring |
== Agenda and Notes == | == Agenda and Notes == | ||
− | |||
− | |||
1. Operations Status and Summary | 1. Operations Status and Summary | ||
Line 11: | Line 9: | ||
LERF Borrowing | LERF Borrowing | ||
+ | C50-12 is nominal solution yielding 11.7 GeV | ||
− | + | No current plans for repurpose LERF modules | |
− | + | ||
− | + | OPS Staytreat | |
2. Heat Measurement Results (Daly) | 2. Heat Measurement Results (Daly) | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
3. C75 (Marhauser/Rimmer) | 3. C75 (Marhauser/Rimmer) | ||
− | 4. FE Meeting | + | 4. FE/Particulate Meeting Report (Geng) |
Latest revision as of 14:41, 28 March 2016
Attendance
R. Bachimanchi, S. Cooper, E. Daly, M. Drury, A. Freyberger, C. Hovater, R. Geng, G. Krafft, C. Mounts, C. Reece, R. Rimmer, T. Plawski, T. Powers, S. Suhring
Agenda and Notes
1. Operations Status and Summary
LERF Borrowing
C50-12 is nominal solution yielding 11.7 GeV
No current plans for repurpose LERF modules
OPS Staytreat
2. Heat Measurement Results (Daly)
3. C75 (Marhauser/Rimmer)
4. FE/Particulate Meeting Report (Geng)