Difference between revisions of "PITMinutes 03-28-2016"

From CASA Wiki
Jump to: navigation, search
(New page: == Attendance == R. Bachimanchi, S. Cooper, E. Daly, K. Davis, M. Drury, C. Hovater, R. Geng, G. Krafft, C. Mounts, C. Reece, T. Reilly, R. Rimmer, T. Plawski, T. Powers, H. Zhang == Age...)
 
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
== Attendance ==
 
== Attendance ==
  
R. Bachimanchi, S. Cooper, E. Daly, K. Davis, M. Drury, C. Hovater, R. Geng, G. Krafft, C. Mounts, C. Reece, T. Reilly, R. Rimmer, T. Plawski, T. Powers, H. Zhang
+
R. Bachimanchi, S. Cooper, E. Daly, M. Drury, A. Freyberger, C. Hovater, R. Geng, G. Krafft, C. Mounts, C. Reece, R. Rimmer, T. Plawski, T. Powers, S. Suhring
  
 
== Agenda and Notes ==
 
== Agenda and Notes ==
 
Particulate Meeting two weeks
 
  
 
1. Operations Status and Summary
 
1. Operations Status and Summary
Line 11: Line 9:
 
LERF Borrowing
 
LERF Borrowing
  
 +
C50-12 is nominal solution yielding 11.7 GeV
  
Piezo work started on R100. Should be possible to
+
No current plans for repurpose LERF modules
get some microphonic damping. Stay tuned, code/software
+
 
problems.
+
OPS Staytreat
  
  
 
2. Heat Measurement Results (Daly)
 
2. Heat Measurement Results (Daly)
 
Cabling damage is starting to be observed.
 
 
Monitor heat load changes, especially in C100s,
 
to see if changes in material show up here.
 
TLDs in the tunnel (end cans and warm girders)
 
 
  
 
3. C75    (Marhauser/Rimmer)
 
3. C75    (Marhauser/Rimmer)
  
4. FE Meeting ReportR&D for improving and maintaining CEBAF gradient (Geng)
+
4. FE/Particulate Meeting Report (Geng)
  
  

Latest revision as of 14:41, 28 March 2016

Attendance

R. Bachimanchi, S. Cooper, E. Daly, M. Drury, A. Freyberger, C. Hovater, R. Geng, G. Krafft, C. Mounts, C. Reece, R. Rimmer, T. Plawski, T. Powers, S. Suhring

Agenda and Notes

1. Operations Status and Summary

LERF Borrowing

C50-12 is nominal solution yielding 11.7 GeV

No current plans for repurpose LERF modules

OPS Staytreat


2. Heat Measurement Results (Daly)

3. C75 (Marhauser/Rimmer)

4. FE/Particulate Meeting Report (Geng)



Action Items