Difference between revisions of "PITMinutes 03-28-2016"

From CASA Wiki
Jump to: navigation, search
(New page: == Attendance == R. Bachimanchi, S. Cooper, E. Daly, K. Davis, M. Drury, C. Hovater, R. Geng, G. Krafft, C. Mounts, C. Reece, T. Reilly, R. Rimmer, T. Plawski, T. Powers, H. Zhang == Age...)
 
Line 11: Line 11:
 
LERF Borrowing
 
LERF Borrowing
  
 
+
OPS Staytreat
Piezo work started on R100. Should be possible to
+
get some microphonic damping. Stay tuned, code/software
+
problems.
+
  
  
 
2. Heat Measurement Results (Daly)
 
2. Heat Measurement Results (Daly)
 
Cabling damage is starting to be observed.
 
 
Monitor heat load changes, especially in C100s,
 
to see if changes in material show up here.
 
TLDs in the tunnel (end cans and warm girders)
 
 
  
 
3. C75    (Marhauser/Rimmer)
 
3. C75    (Marhauser/Rimmer)
  
4. FE Meeting ReportR&D for improving and maintaining CEBAF gradient (Geng)
+
4. FE Meeting Report (Geng)
  
  

Revision as of 12:59, 28 March 2016

Attendance

R. Bachimanchi, S. Cooper, E. Daly, K. Davis, M. Drury, C. Hovater, R. Geng, G. Krafft, C. Mounts, C. Reece, T. Reilly, R. Rimmer, T. Plawski, T. Powers, H. Zhang

Agenda and Notes

Particulate Meeting two weeks

1. Operations Status and Summary

LERF Borrowing

OPS Staytreat


2. Heat Measurement Results (Daly)

3. C75 (Marhauser/Rimmer)

4. FE Meeting Report (Geng)



Action Items