Revision history of "File:Crab sisg 11sep2017.pptx"

From CASA Wiki
Jump to: navigation, search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • (cur | prev) 10:21, 14 September 2017Salvaisg (Talk | contribs). . (205 bytes) (+205). . (Preliminary calculations of Longitudinal and Transverse Coupled Bunch Instabilities of a non-optimized 3-cell RF Dipole, with 2 waveguide couplers and 70mm aperture. CBI calculations using LBNL's code ZAP.)